Machinery experts provide the installation of powder grinder

2013-01-09 03:39:17


CLIRIK is Shanghai region's most professional production enterprise of powder grinder, which is also called micro powder grinder, industrial powder grinder, fine powder grinder, powder grinder series, powder grinder machine. CKIRIK provide free installation for the powder grinder,micro powder grinder customers and one year of free maintenance service. How to install powder grinder,micro powder grinder? CLIRIK mechanical experts will give you the detailed description following.
 
The full powder grinder, micro powder grinder production line including: hammer crusher, elevator, hopper, feeder, Mill host, integrator, ESP, air compressor, fan, soundproof room, the powder machines and other equipment. Material from the crushing, upgrade to a grinding, complete the upgrade by equipment package.
 
First, the basic installation design of the powder grinder,micro powder grinder production line, powder grinder,micro powder grinder production line installed in the concrete foundation, the foundation should bear the whole weight several times. Without pouring concrete, the temporary use of a steel frame to do support, good ground concrete pouring, steel frame can be fixed. According to the different venues of powder grinder, micro powder grinder production line can be installed in operating the plant or installation in outdoor jobs.
 
Secondly, after pulverizing site installation should conduct a comprehensive inspection. Check the oil pipe is connected securely installed before the trial run heavier oil, add oil. Check the grid parts oil tube is connected firmly, carefully check the impeller on whether there is a foreign body.
 
Finally, check the motor belt between now inching motor rotation should be consistent with the direction of the powder grinder,micro powder grinder production line signage should adjust the motor wiring and signage direction opposite its rotation with signs consistent non-rotating. Dual-motor-driven spindle assembly with both sides of the motor, the wind do not have the same number of V-belt connected to the spindle assembly straight should be adjusted accordingly. After the check, and then production, empty load test machine is first pre-production, production by the test machine to confirm there is no problem before.